Client

Farm Prčice Ltd

Technologies

Cleaners
Conveyors
Dryer NECO

Realization date

2017

Location

Sedlec-Prčice
district Příbram
CR

Project Description

Expansion of production operations on the farm Prčice s.r.o. took place in 2018, when a continuous grain dryer NECO D1690 CE was installed in operation on natural gas with an output of 25 t / hour (wheat 17-13%) and transport routes.

2 x NECO D1690 CE continuous grain dryer

  • Heating medium: natural gas
  • Output: 25 t / h (wheat 17-13%)
  • Power input: 25 kW

Traffic routes and conveyors