The first part of the post-harvest line construction.
During the 1st stage of the construction of the post-harvest line in Sušany near Most, the NECO 1690 dryer, two MFS grain silos, the MFS funnel silo, the receiving basket and the transport system were delivered.
NECO D1690CE dryer
2x MFS grain silo
MFS HT15-7-60 Funnel Silo
Income basket
Transportation system